Type C FIBC big bags
To ensure safe and efficient handling during loading/unloading operations of a potentially flammable FIBC Type C Big Bag or that may create an explosive atmosphere, it is essential to prevent the buildup of static electricity.
Therefore, proper grounding of the Big Bag will be necessary prior to any processing.
The Logic ECS-R-FIBC system is specifically designed for this purpose, effectively dissipating any static electricity that may build up and ensuring a grounding connection with window resistivity between xx Ω and yy Ω over time to verify its integrity as well.
The Logic CLP-FIBC clamp design is designed for maximum connection effectiveness to the conductive tabs of the Big-bag. By using the dual clamp solution, it is possible to verify not only the ground connection, but also the integrity of the conductive grid of the Big-bag itself.
The devices in the ECS-R range consist of an electronic monitoring system with SIL2 integrity level to be combined with the Logic CLP-FIBC clamp.
Thanks to the device’s integrated electronics, dynamic and constant grounding monitoring can be carried out during tank car loading/unloading operations. This system is able to detect a resistance of less than 10 Ω and, if the safety values are not met, immediately stops the process and warns the operator.
The range includes different solutions that can be installed in Zone 1/21, in Zone 2/22 or inside an electrical cabinet mounted directly on a DIN rail (Safe Area).
To manage maximum flexibility and adaptability of the Logic ECS-RF-FIBC grounding system, you can choose from the following accessories :
- ● CAB-ECS-6C1.0 Electrical extension cable
- ● ECS-MULTI electrical box suitable for installation of MDC monitoring systems
- ● JBL Scatola di giunzione dotata di LED (verde e rosso) a bordo